Tuesday 29 May 2012

Memorial building

Preparing the ground

 
During this week, among of the many fronts of work, activities were intensified
where we have the Memorial Building.







The first step was to excavate the site and posteriorly, the foundations have been
performed by the method continuous helix.
We are currently performing the demolition of the stakes to be
made the implementation of the blocks and beams of the foundations.
After this procedure, the sealing of those blocks and beams will be made and
then the release of the forms and the beginning of the superstructure (pillars,
beams and slabs).

Everything we will show step by step during all the construction phases, once the
camera position does not allow us to demonstrate the entire course in the LIVE LINK.