Thursday 1 November 2012

Activities are being completed


We are facing a work with numerous challenges, as we have talked of more than two years of work. Some activities are being completed. Among them we have the structural and TAG (Tank of Cold Water), which since its design, manufacturing, assembly and now the assembling in the work, we have shown and will continue showing the step by step, logistics and the inherent care in a
system of this complexity.




We informed that the first step – the assembling in the work - has been
completed, but there are still two left: the outer covering of the tanks with
thermal insulation, equipped with a flame retardant additive, and a hydrostatic
test after. 

After being completed these activities will be covered by concrete
structure, being similar to the others, so that will be embedded in the three great
pillars to the right of the front facade (who is at Avenida Celso Garcia looks at the
property). Remembering that now our 
NEW CAMERA LIVE may also accompany all
activities.

No comments:

Post a Comment