Several activities of the work





 The work is at an advanced stage with regard to the implementation of its structure, but we still have areas to be concreted, and maintain the same care from the beginning, thus having the same tracking.

However, we, internally, several activities going on at once, among them:

 
 - Masonry (pictured above), which are also well advanced;



- Installations - photos above and below - (electrical; special systems, air conditioning and fire fighting);
- Finishes - pictured below - (ceramic covering) in bathrooms.
 All these services distributed in different floors of the work.