Technology applied




Every day, the work activities are supervised by professionals who seek to monitor the materials used and services performed in such a way that they meet strict criteria set out in Standard, and the strictest quality standards.
These professionals also use computer programs that generate a three dimensional virtual environment, where they modeled the designs of Solomon's Temple. This methodology allows a multidisciplinary analysis, so engineers and technicians from different areas can know potential problems that could occur during the construction phase, avoiding rework, improving the quality of facilities and avoiding unnecessary expenses.
This technology also enables achieving a detailed project-level executive end, allowing an overview of the Temple of Solomon still in the design phase. In addition, several items such as lighting, piping, location of equipment and even a building energy analysis can be assessed.
Here, beside the picture from the top of each of the three "Cold Water Tanks", which are still in the installation work. Currently, 16 meters high, the tanks will reach nearly 60 meters and will be embedded within the three main front pillars, at right side of the Temple.


Tuesday, 21 February 2012

First step complete.


In the last week of 2011, three pillars of 50 meters in height and 7 of 30 meters were completed. 




The work has advanced on several fronts simultaneously, and each day, and this can be verified,  in just seven days completed more seven pillars of the of Solomon's Temple, while facing rainy days.

This time, were raised 4 on the right side and three on the left. This is due to the fact that we have, for this constructive process, uninterrupted 24-hour shifts.


To get an idea in each of these pillars of 30 meters are used approximately 40 cubic meters of concrete, and the higher with 50 meters, around 100 m³.

As we have a total of 32 pillars, 26 to 30 meters and six meters high with 50, will be used in molding its more than 1600 cubic meters of concrete.
In the second week of February was completed the concreting of seven pillars, six of which will be part of the facade of funds and the side. 
With the completion of these, 
now are 24 completed pillars, 
missing five of 30 meters and
three of 50 meters.

These three will be the last, since it requires the completion of installation of the Cold Water Tanks, for its execution.
We know we have many challenges ahead, but the Spirit of Creation is at the forefront of this project.



We would like to thank all employees who have dedicated themselves in this wonderful project and Special all who have contributed financially to effective construction of the temple.

Thursday, 16 February 2012

Prayer on the ground of the Temple of Solomon




During a program broadcast from Brazil, on IURD TV, at noon, Monday, 19/01, Bishop Romualdo Panceiro, together with the Bishop Jadson Santos and other Pastors, cry out for the people that sent the names and pictures to be placed in the columns of the future King Salomon Temple, who is still in construction, so that as the Temple is raised, also the life of those who sent the names and pictures will have the same evolution.

“He who overcomes, I will make him a pillar in the temple of My God, and he shall go out no more. I will write on him the name of My God and the name of the city of My God, the New Jerusalem, which comes down out of heaven from My God. And I will write on him My new name.” (Revelation 3:12)

“We want that, as well as these columns they are being raised, the life of these people also be transformed, and that next pictures that they will take, will show their life transformed” determined Bishop Jadson.

The names of the members from UCKG Ireland also will be placed in the columns of King Solomon Temple.

To send your name or for more information, asks to a Pastor on the UCKG Help Centre near your house or contact us. 

Tuesday, 14 February 2012

Processing of the stones of Israel




In previous post, we reported the coming of the stones from Israel. (see here) 
Once this step done has been initiated, the processing thereof. This processing is to prepare the stones - the model known as taltishe 25x50cm - so they can be installed in all exterior walls of the Temple, through a method called "ventilated facade." For this, the stones will receive a cut in its top and bottom, allowing them to be embedded in a metal frame attached to, and receive a waterproof layer that will protect them throughout 
their life (see photo) . 


Among the benefits of this facade, we can highlight the ease of maintenance, because each stone can be removed individually, and provide great comfort thermal / acoustic due to the space that is created between the stones and the wall of the Temple.


This whole process will be developed in the shed near the work where the stones are stored. A specialist company has been hired only to prepare this work, which includes, besides the processing, the selection of stones and listing them in order to facilitate the application in the work.
Once again our concern for the environment can be proven by extracting the residual dust of this processing, which will be properly collected and will form the compound of the pieces we make the grout in geopolymer.

Sunday, 12 February 2012

The memorial



As a special complement of the Solomon's temple, the building called Memorial occupies an area of ​​approximately 650 m². This building will offer to the visitors not only the possibility of recovering some of the history of ancient Temples, but also interact through technology with all this information.
Divided into different screenplays for visitors, people there can make a journey through time and learn more about the origin of this history. They can see through faithful replica, the elements that existed at that time in the Temple, and know a little of the origin of the twelve tribes of Israel.


In another route, visitors will learn about the history of the Temple of the Universal Church, from its conception, preparation of drawings, models, stages of construction, concern for the environment, until the full completion of the project.


An auditorium for 100 people will be used for lectures.


The tours will be guided by guides and will be available in some languages​​, so as to allow the perfect understanding of history, not only for Brazilian visitors, but also for tourists from around the world.

Friday, 10 February 2012

Stones from Israel -The Holy Land


Some of the stones that will cover the Solomon's Temple has arrived in Brazil. Made in the quarry of Hebron, in Israel, the three rock types are stored in a shed in the neighborhood of Bras.
The process of extraction of stones was closely followed by team Engiurd, which recorded the time they were cut by backhoes, sawn into boards.

The first model, called Taltishe, which measures 25x50x3, widely used in most buildings in Jerusalem, will serve to cover the entire exterior of the temple, about 19 thousand square meters.

And to cover the internal floor, the model will be used Brushed Stone, size 80x80.

The pillars will receive a type of stone called Matabeh, which measures 50x100x3, who will share interim polished with rough cuts, giving highlights  to the external pillar.

But the creative team responsible for this large building does not stop, a new model of stone, with golden color, called Jerusalem Gold, is being considered to cover the altar.
The forecast final delivery of all the stones to be used in the project must occur by May 2012, when will have a total of 39 thousand square meters
of stone from the Holy Land.